ITAC Assessment: UU0302
ITAC logo
ITAC Assessment: UU0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Health & wellness product
NAICS 493110: General Warehousing and Storage
SIC 4225: General Warehousing and Storage
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 327,000
ft2
Annual Production 60,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,915 1,884,300
kWh
Electricity Demand $92,792 5,579
kW-mo/yr
Electricity Fees $76,790 -
Natural Gas $155,619 22,486
MMBtu
TOTAL YEARLY COSTS $394,116
RECOMMENDED SAVINGS* $144,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $103,610 $100,000 - - - $103,610
-
MMBtu
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,000 $9,600 - $5,000
-
kW-mo/yr
- - - -
03 2.3141: Use battery storage for demand control $9,420 $20,000 - - $9,420 - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $880 $740 $880
24,120
kWh
- - - - -
05 3.1162: Use less wasteful packaging $14,500 $44,660 - - - - $14,200
-
lb
$300
06 2.7261: Install timers and/or thermostats $1,290 $1,800 - - - $1,290
-
MMBtu
- -
07 2.7221: Lower temperature during the winter season and vice-versa $8,450 $11,400 - - - $8,450
-
MMBtu
- -
08 2.7221: Lower temperature during the winter season and vice-versa $510 $1,410 $245
6,540
kWh
- - $265
-
MMBtu
- -
09 4.821: Pay bills on time to avoid late fees $970 $1,000 - - $970 - - -
TOTAL RECOMMENDED $144,630 $190,610 $1,125
30,660
kWh
$5,000
-
kW-mo/yr
$10,390 $113,615
-
MMBtu
$14,200
-
lb
$300
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs