ITAC Assessment: AM0961
ITAC logo
ITAC Assessment: AM0961
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Pre-engineered metal building components
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 226
Plant Area 480,000
ft2
Annual Production 27,000
ton
Production Hrs. Annual 7,344
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,839 4,318,129
kWh
Electricity Demand $163,333 17,175
kW-mo/yr
Electricity Fees $37,450 -
Natural Gas $72,040 11,988
MMBtu
TOTAL YEARLY COSTS $564,662
RECOMMENDED SAVINGS* $190,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $118,795 $20,000 - - $26,695 $3,000 $89,100
02 2.3212: Optimize plant power factor $12,900 $36,800 - $12,900
-
kW-mo/yr
- - -
03 3.1191: Change procedures / equipment / operating conditions $13,100 $55,700 $13,100
193,000
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $765 $188 $623
9,160
kWh
$142
-
kW-mo/yr
- - -
05 2.4224: Upgrade controls on compressors $3,112 $36,750 $2,210
32,500
kWh
$902
-
kW-mo/yr
- - -
06 2.9114: Use solar heat to make electricty $41,400 $835,300 $41,400
609,000
kWh
- - - -
TOTAL RECOMMENDED $190,072 $984,738 $57,333
843,660
kWh
$13,944
-
kW-mo/yr
$26,695 $3,000 $89,100
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs