Assessment Year | 1994 |
---|---|
Principal Product | Wood / Metal Kitchen Furniture |
NAICS |
n/a
|
SIC | 2514: Metal Household Furniture |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
445,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $261,008 | 4,615,475 |
kWh
|
$0.057 |
LPG | $67,709 | 8,462 |
MMBtu
|
$8.00 |
Fuel Oil #2 | $30,398 | 6,305 |
MMBtu
|
$4.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,462 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,175 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,391 | $1,620 |
$5,391
94,666
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,132 | $700 |
$1,132
19,930
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $1,131 | $500 | - |
$1,131
-
MMBtu
|
|
04 | 2.6218: Turn off equipment when not in use | $824 | - |
$824
14,361
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,711 | $1,085 |
$3,711
65,064
kWh
|
- | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $664 | $820 |
$664
11,723
kWh
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $7,987 | $17,200 | - |
$7,987
-
MMBtu
|
|
08 | 2.7241: Install outside air damper / economizer on hvac unit | $1,639 | $2,000 |
$1,639
28,722
kWh
|
- | |
09 | 2.4133: Use most efficient type of electric motors | $2,960 | $9,280 |
$2,960
51,876
kWh
|
- | |
10 | 2.2443: Re-use or recycle hot or cold process exhaust air | $6,023 | $3,650 | - |
$6,023
-
MMBtu
|
|
TOTAL RECOMMENDED | $31,462 | $36,855 |
$16,321
286,342
kWh
|
$15,141
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,175 | $10,900 |
$9,175
160,903
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs