ITAC Assessment: TT0066
ITAC logo
ITAC Assessment: TT0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product English Muffins, biscuits, and hearth products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range less than $500
k
# of Employees 120
Plant Area 52,000
ft2
Annual Production 26,732,172
units
Production Hrs. Annual 7,280
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,139 5,149,200
kWh
Electricity Demand $134,781 9,175
kW-mo/yr
Electricity Fees $(-23,377.4) -
Natural Gas $385,409 48,164
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,900 $7,100 $4,200
72,668
kWh
$1,500
-
kW-mo/yr
- $2,200
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,500 $6,200 $2,560
44,352
kWh
$930
-
kW-mo/yr
- $10
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,800 $5,700 $1,700
29,786
kWh
$600
-
kW-mo/yr
- $500
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,000 $41,100 $10,800
187,488
kWh
$3,900
-
kW-mo/yr
- $1,300
05 2.1213: Direct warmest air to combustion intake $2,200 $600 - - $2,200
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $140 $30 - - $140
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,900 $5,000 $9,500
164,200
kWh
$2,400
-
kW-mo/yr
- -
TOTAL RECOMMENDED $44,440 $65,730 $28,760
498,494
kWh
$9,330
-
kW-mo/yr
$2,340
-
MMBtu
$4,010
TOTAL IMPLEMENTED $140 $30 - - $140
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs