| Assessment Year | 2026 |
|---|---|
| Principal Product | Industrial Machinery Equipment |
| NAICS | 333249: Other Industrial Machinery Manufacturing |
| SIC | 3549: Metalworking Machinery, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 120 |
| Plant Area |
152,000
ft2
|
| Annual Production | 30
units
|
| Production Hrs. Annual | 4,290
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $30,256 | 819,957 |
kWh
|
$0.037 |
| Electricity Demand | $48,887 | 2,900 |
kW-mo/yr
|
$16.86 |
| Electricity Fees | $14,937 | - |
|
- |
| Natural Gas | $32,020 | 5,342 |
MMBtu
|
$5.99 |
| LPG | $2,463 | 1 |
MMBtu
|
$2,462.54 |
| Other Gas | $1,200 | 1 |
MMBtu
|
$1,200.36 |
| TOTAL YEARLY COSTS | $129,763 | |||
| RECOMMENDED SAVINGS* | $20,715 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,444 | - | - |
$2,444
-
kW-mo/yr
|
- | - | |
| 02 | 2.8121: Apply for tax-free status for energy purchases | $4,915 | - | - | - | - | $4,915 | |
| 03 | 2.7144: Install spectral reflectors / delamp | $878 | - |
$386
10,433
kWh
|
$492
-
kW-mo/yr
|
- | - | |
| 04 | 3.1161: Eliminate/reduce an operation | $5,760 | - |
$2,060
55,688
kWh
|
$2,276
-
kW-mo/yr
|
$1,424
-
MMBtu
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $194 | - |
$194
5,245
kWh
|
- | - | - | |
| 06 | 2.7224: Reduce space conditioning during non-working hours | $190 | - |
$190
5,148
kWh
|
- | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $584 | $122 |
$584
15,796
kWh
|
- | - | - | |
| 08 | 2.4322: Use or replace with energy efficient substitutes | $451 | $1,009 |
$98
2,660
kWh
|
$125
-
kW-mo/yr
|
- | $227 | |
| 09 | 2.7243: Improve air circulation with destratification fans / other methods | $4,788 | $14,148 |
$(-170.9)
(-4,620)
kWh
|
$236
-
kW-mo/yr
|
$4,723
-
MMBtu
|
- | |
| 10 | 2.6211: Conserve energy by efficient use of vending machines | $429 | $1,559 |
$429
11,607
kWh
|
- | - | - | |
| 11 | 2.4221: Install compressor air intakes in coolest locations | $80 | $352 |
$80
2,162
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $20,715 | $17,190 |
$3,852
104,118
kWh
|
$5,574
-
kW-mo/yr
|
$6,146
-
MMBtu
|
$5,142 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs