ITAC Assessment: SU0608
ITAC logo
ITAC Assessment: SU0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Industrial Machinery Equipment
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3549: Metalworking Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 152,000
ft2
Annual Production 30
units
Production Hrs. Annual 4,290
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,256 819,957
kWh
Electricity Demand $48,887 2,900
kW-mo/yr
Electricity Fees $14,937 -
Natural Gas $32,020 5,342
MMBtu
LPG $2,463 1
MMBtu
Other Gas $1,200 1
MMBtu
TOTAL YEARLY COSTS $129,763
RECOMMENDED SAVINGS* $20,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,444 - - $2,444
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $4,915 - - - - $4,915
03 2.7144: Install spectral reflectors / delamp $878 - $386
10,433
kWh
$492
-
kW-mo/yr
- -
04 3.1161: Eliminate/reduce an operation $5,760 - $2,060
55,688
kWh
$2,276
-
kW-mo/yr
$1,424
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $194 - $194
5,245
kWh
- - -
06 2.7224: Reduce space conditioning during non-working hours $190 - $190
5,148
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $584 $122 $584
15,796
kWh
- - -
08 2.4322: Use or replace with energy efficient substitutes $451 $1,009 $98
2,660
kWh
$125
-
kW-mo/yr
- $227
09 2.7243: Improve air circulation with destratification fans / other methods $4,788 $14,148 $(-170.9)
(-4,620)
kWh
$236
-
kW-mo/yr
$4,723
-
MMBtu
-
10 2.6211: Conserve energy by efficient use of vending machines $429 $1,559 $429
11,607
kWh
- - -
11 2.4221: Install compressor air intakes in coolest locations $80 $352 $80
2,162
kWh
- - -
TOTAL RECOMMENDED $20,715 $17,190 $3,852
104,118
kWh
$5,574
-
kW-mo/yr
$6,146
-
MMBtu
$5,142
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs