ITAC Assessment: OK0695
ITAC logo
ITAC Assessment: OK0695
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Pizza Crust
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 48,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,313 3,544,466
kWh
Electricity Demand $75,406 9,050
kW-mo/yr
Electricity Fees $50,366 -
Natural Gas $19,293 2,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,295 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,553

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7425: Clean or color roof to reduce solar load $35,493 $329,564 $35,493
553,718
kWh
- - - - - -
02 2.2437: Recover waste heat from equipment $17,436 $17,500 - - - $17,436
-
MMBtu
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,386 $4,515 $1,386
48,444
kWh
- - - - - -
04 2.7241: Install outside air damper / economizer on hvac unit $10,723 $21,750 $10,723
374,912
kWh
- - - - - -
05 2.8112: Combine utility meters $2,354 $2,546 - - $1,612 - - $742 -
06 2.4156: Establish a preventative maintenance program $6,830 - - - - - $6,830 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $17,073 $23,985 $11,472
178,963
kWh
$4,296
-
kW-mo/yr
- - $4,950 - $(-3,645.0)
TOTAL RECOMMENDED $91,295 $399,860 $59,074
1,156,037
kWh
$4,296
-
kW-mo/yr
$1,612 $17,436
-
MMBtu
$11,780 $742 $(-3,645.0)
TOTAL IMPLEMENTED $17,553 $21,750 $10,723
374,912
kWh
- - - $6,830 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs