ITAC Assessment: DL0274
ITAC logo
ITAC Assessment: DL0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product metal framing components
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 47,000
ft2
Annual Production 96,000,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,435 960,416
kWh
Electricity Demand $46,500 3,567
kW-mo/yr
Electricity Fees $1,800 -
Natural Gas $86,424 7,474
MMBtu
Other Gas $808 1
MMBtu
TOTAL YEARLY COSTS $232,967
RECOMMENDED SAVINGS* $46,702 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $803 - $803
5,355
kWh
-
02 2.2437: Recover waste heat from equipment $2,358 $1,000 - $2,358
-
MMBtu
03 3.1191: Change procedures / equipment / operating conditions $3,224 - $3,224
21,492
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,336 $16,500 $4,336
28,908
kWh
-
05 2.7231: Use radiant heater for spot heating $6,910 $35,000 - $6,910
-
MMBtu
06 2.2421: Install waste heat boiler to provide direct power $23 $2,200 - $23
-
MMBtu
07 2.6231: Utilize controls to operate equipment only when needed $657 $320 $657
4,381
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,954 $2,500 $5,954
39,690
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $11,772 $8,106 $11,772
78,479
kWh
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,035 $8,000 $3,035
20,232
kWh
-
11 2.2449: Recover heat from exhausted steam, hot air or hot water $6,370 $2,000 - $6,370
-
MMBtu
12 2.1224: Replace boiler $1,260 $7,000 - $1,260
-
MMBtu
TOTAL RECOMMENDED $46,702 $82,626 $29,781
198,537
kWh
$16,921
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs