ITAC Assessment: OK0246
ITAC logo
ITAC Assessment: OK0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product NEWSPAPERS
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 506
Plant Area
n/a
Annual Production 86,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,933 10,840,856
kWh
Natural Gas $135,299 31,427
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6121: Reduce hot water temperature to the minimum required $2,000 - - $2,000
-
MMBtu
02 2.7314: Reduce ventilation air $7,120 - $7,120
228,605
kWh
-
03 2.6218: Turn off equipment when not in use $1,483 $300 $1,483
47,773
kWh
-
04 2.7314: Reduce ventilation air $6,835 - $6,835
175,264
kWh
-
05 2.2122: Install / repair insulation on condensate lines $180 $155 - $180
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,414 $1,880 $3,414
87,632
kWh
-
07 2.2425: Use flue gases to heat process or service water $395 $620 - $395
-
MMBtu
TOTAL RECOMMENDED $21,427 $2,955 $18,852
539,274
kWh
$2,575
-
MMBtu
TOTAL IMPLEMENTED $16,135 $155 $13,955
403,869
kWh
$2,180
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs