ITAC Assessment: AM0738
ITAC logo
ITAC Assessment: AM0738
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Munitions
NAICS 332992: Small Arms Ammunition Manufacturing
SIC 3482: Small Arms Ammunition
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 743,000
ft2
Annual Production 23,000,000
pieces
Production Hrs. Annual 2,079
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,528 5,618,462
kWh
Electricity Demand $126,502 20,811
kW-mo/yr
Natural Gas $254,258 46,383
MMBtu
Waste Disposal Costs
Water Usage $13,414 9,582
Tgal
Water Disposal $25,530 3,908
Tgal
TOTAL YEARLY COSTS $738,232
RECOMMENDED SAVINGS* $67,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $23,860 $39,900 - $23,860
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,030 $41,200 $4,480
104,000
kWh
$6,550
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,870 $3,000 $5,210
120,850
kWh
$5,660
-
kW-mo/yr
- - -
04 2.2121: Increase amount of condensate returned $10,870 $19,400 - - $2,530
-
MMBtu
$870
-
Tgal
$7,470
05 2.2511: Insulate bare equipment $10,990 $9,760 - - $10,990
-
MMBtu
- -
TOTAL RECOMMENDED $67,620 $113,260 $9,690
224,850
kWh
$36,070
-
kW-mo/yr
$13,520
-
MMBtu
$870
-
Tgal
$7,470
TOTAL IMPLEMENTED $67,620 $113,260 $9,690
224,850
kWh
$36,070
-
kW-mo/yr
$13,520
-
MMBtu
$870
-
Tgal
$7,470
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs