ITAC Assessment: IP0034
ITAC logo
ITAC Assessment: IP0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Power transmission, wet wheel braking systems
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 400,000
ft2
Annual Production 48,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $755,494 23,273,600
kWh
Electricity Demand $1,207,187 50,911
kW-mo/yr
Electricity Fees $(-218,032.0) -
Natural Gas $939,702 193,753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,566

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,454 - $4,454
137,060
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,112 - $1,112
34,211
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $111 - $111
3,428
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,686 $636 $2,751
84,640
kWh
$3,935
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $974 $104 - - $974
-
MMBtu
06 2.4322: Use or replace with energy efficient substitutes $4,451 $845 $4,451
136,966
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $41,425 $89,660 $17,044
524,425
kWh
$24,381
-
kW-mo/yr
-
TOTAL RECOMMENDED $59,213 $91,245 $29,923
920,730
kWh
$28,316
-
kW-mo/yr
$974
-
MMBtu
TOTAL IMPLEMENTED $5,566 - $5,566
171,271
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs