| Assessment Year | 2026 |
|---|---|
| Principal Product | Printed wire boards, circuit card assemblies, machined parts and fabricated structures, and top level assemblies |
| NAICS | 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
| SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
| Sales Range | greater than $500 M |
| # of Employees | 2,400 |
| Plant Area |
1,427,000
ft2
|
| Annual Production | 179,900,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,606,422 | 36,282,121 |
kWh
|
$0.044 | |
| Electricity Demand | $1,541,767 | 68,928 |
kW-mo/yr
|
$22.37 | |
| Electricity Fees | $609,792 | - |
|
- | |
| Natural Gas | $681,712 | 140,921 |
MMBtu
|
$4.84 | |
| Other Gas | $45,419 | 1 |
MMBtu
|
$45,419.43 | |
| Other Energy | $168,790 | 1 |
MMBtu
|
$168,789.54 | |
| Waste Disposal Costs | |||||
| Water Usage | $227,098 | 47,311 |
Tgal
|
$4.80 | |
| TOTAL YEARLY COSTS | $4,881,001 | ||||
| RECOMMENDED SAVINGS* | $641,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $135,008 | - | - | - | - | $135,008 | - | - | |
| 02 | 2.7144: Install spectral reflectors / delamp | $691 | - |
$176
3,994
kWh
|
$515
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.3132: Recharge batteries on during off-peak demand periods | $412 | - | - |
$412
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.6218: Turn off equipment when not in use | $1,415 | - |
$1,415
32,161
kWh
|
- | - | - | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,936 | - |
$2,936
66,733
kWh
|
- | - | - | - | - | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $77,089 | - | - |
$77,089
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.8124: Hire energy manager | $110,333 | - |
$97,381
2,213,209
kWh
|
- |
$12,952
-
MMBtu
|
- | - | - | |
| 08 | 3.1161: Eliminate/reduce an operation | $48,642 | - |
$14,642
332,775
kWh
|
$40,866
-
kW-mo/yr
|
$(-6,866.5)
-
MMBtu
|
- | - | - | |
| 09 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $16,881 | $2,012 |
$16,881
383,666
kWh
|
- | - | - | - | - | |
| 10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,248 | $2,502 |
$(-33.6)
(-762)
kWh
|
- |
$2,282
-
MMBtu
|
- | - | - | |
| 11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,022 | $34,904 |
$21,022
477,812
kWh
|
- | - | - | - | - | |
| 12 | 2.5117: Convert to indirect temperature control system | $79,614 | $178,375 |
$2,534
57,588
kWh
|
$77,080
-
kW-mo/yr
|
- | - | - | - | |
| 13 | 4.122: Develop standard procedures to improve internal yields | $35,913 | $82,683 |
$(-270.0)
(-6,136)
kWh
|
$(-791.8)
-
kW-mo/yr
|
- | - | - | $36,975 | |
| 14 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,680 | $17,843 |
$1,605
36,475
kWh
|
$4,706
-
kW-mo/yr
|
- | - | $1,369 | - | |
| 15 | 2.7447: Install vinyl strip / high speed / air curtain doors | $716 | $1,753 | - | - |
$716
-
MMBtu
|
- | - | - | |
| 16 | 2.2136: Install / repair insulation on steam lines | $2,235 | $6,878 | - | - |
$2,235
-
MMBtu
|
- | - | - | |
| 17 | 2.2437: Recover waste heat from equipment | $32,253 | $100,000 | - | - |
$32,253
-
MMBtu
|
- | - | - | |
| 18 | 2.7442: Keep doors and windows shut when not on use | $1,141 | $3,634 | - | - |
$1,141
-
MMBtu
|
- | - | - | |
| 19 | 2.6211: Conserve energy by efficient use of vending machines | $594 | $2,580 |
$594
13,495
kWh
|
- | - | - | - | - | |
| 20 | 2.7144: Install spectral reflectors / delamp | $1,833 | $8,422 |
$466
10,591
kWh
|
$1,367
-
kW-mo/yr
|
- | - | - | - | |
| 21 | 2.7314: Reduce ventilation air | $3,156 | $18,926 |
$633
14,384
kWh
|
- |
$2,523
-
MMBtu
|
- | - | - | |
| 22 | 2.7243: Improve air circulation with destratification fans / other methods | $4,217 | $38,439 |
$(-597.4)
(-13,577)
kWh
|
$(-835.7)
-
kW-mo/yr
|
$5,650
-
MMBtu
|
- | - | - | |
| 23 | 2.7135: Install occupancy sensors | $237 | $2,676 |
$237
5,391
kWh
|
- | - | - | - | - | |
| 24 | 2.9114: Use solar heat to make electricty | $55,163 | $708,480 |
$55,163
1,253,702
kWh
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $641,430 | $1,210,108 |
$214,784
4,881,501
kWh
|
$200,409
-
kW-mo/yr
|
$52,886
-
MMBtu
|
$135,008 | $1,369 | $36,975 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs