ITAC Assessment: SU0611
ITAC logo
ITAC Assessment: SU0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Printed wire boards, circuit card assemblies, machined parts and fabricated structures, and top level assemblies
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range greater than $500
M
# of Employees 2,400
Plant Area 1,427,000
ft2
Annual Production 179,900,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,606,422 36,282,121
kWh
Electricity Demand $1,541,767 68,928
kW-mo/yr
Electricity Fees $609,792 -
Natural Gas $681,712 140,921
MMBtu
Other Gas $45,419 1
MMBtu
Other Energy $168,790 1
MMBtu
Waste Disposal Costs
Water Usage $227,098 47,311
Tgal
TOTAL YEARLY COSTS $4,881,001
RECOMMENDED SAVINGS* $641,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.8121: Apply for tax-free status for energy purchases $135,008 - - - - $135,008 - -
02 2.7144: Install spectral reflectors / delamp $691 - $176
3,994
kWh
$515
-
kW-mo/yr
- - - -
03 2.3132: Recharge batteries on during off-peak demand periods $412 - - $412
-
kW-mo/yr
- - - -
04 2.6218: Turn off equipment when not in use $1,415 - $1,415
32,161
kWh
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,936 - $2,936
66,733
kWh
- - - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $77,089 - - $77,089
-
kW-mo/yr
- - - -
07 2.8124: Hire energy manager $110,333 - $97,381
2,213,209
kWh
- $12,952
-
MMBtu
- - -
08 3.1161: Eliminate/reduce an operation $48,642 - $14,642
332,775
kWh
$40,866
-
kW-mo/yr
$(-6,866.5)
-
MMBtu
- - -
09 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $16,881 $2,012 $16,881
383,666
kWh
- - - - -
10 2.7447: Install vinyl strip / high speed / air curtain doors $2,248 $2,502 $(-33.6)
(-762)
kWh
- $2,282
-
MMBtu
- - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,022 $34,904 $21,022
477,812
kWh
- - - - -
12 2.5117: Convert to indirect temperature control system $79,614 $178,375 $2,534
57,588
kWh
$77,080
-
kW-mo/yr
- - - -
13 4.122: Develop standard procedures to improve internal yields $35,913 $82,683 $(-270.0)
(-6,136)
kWh
$(-791.8)
-
kW-mo/yr
- - - $36,975
14 2.7142: Utilize higher efficiency lamps and/or ballasts $7,680 $17,843 $1,605
36,475
kWh
$4,706
-
kW-mo/yr
- - $1,369 -
15 2.7447: Install vinyl strip / high speed / air curtain doors $716 $1,753 - - $716
-
MMBtu
- - -
16 2.2136: Install / repair insulation on steam lines $2,235 $6,878 - - $2,235
-
MMBtu
- - -
17 2.2437: Recover waste heat from equipment $32,253 $100,000 - - $32,253
-
MMBtu
- - -
18 2.7442: Keep doors and windows shut when not on use $1,141 $3,634 - - $1,141
-
MMBtu
- - -
19 2.6211: Conserve energy by efficient use of vending machines $594 $2,580 $594
13,495
kWh
- - - - -
20 2.7144: Install spectral reflectors / delamp $1,833 $8,422 $466
10,591
kWh
$1,367
-
kW-mo/yr
- - - -
21 2.7314: Reduce ventilation air $3,156 $18,926 $633
14,384
kWh
- $2,523
-
MMBtu
- - -
22 2.7243: Improve air circulation with destratification fans / other methods $4,217 $38,439 $(-597.4)
(-13,577)
kWh
$(-835.7)
-
kW-mo/yr
$5,650
-
MMBtu
- - -
23 2.7135: Install occupancy sensors $237 $2,676 $237
5,391
kWh
- - - - -
24 2.9114: Use solar heat to make electricty $55,163 $708,480 $55,163
1,253,702
kWh
- - - - -
TOTAL RECOMMENDED $641,430 $1,210,108 $214,784
4,881,501
kWh
$200,409
-
kW-mo/yr
$52,886
-
MMBtu
$135,008 $1,369 $36,975
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs