Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Boilers
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 174,500
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,413 4,260,760
kWh
Electricity Demand $79,514 5,322
kW-mo/yr
Electricity Fees $23,067 -
Natural Gas $102,796 17,940
MMBtu
Other Gas $6,941 1
MMBtu
TOTAL YEARLY COSTS $302,731
RECOMMENDED SAVINGS* $60,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $18,087 - - - - - $18,087
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,976 - - $3,976
-
kW-mo/yr
- - -
03 3.1161: Eliminate/reduce an operation $2,983 - $945
45,000
kWh
$3,137
-
kW-mo/yr
$(-1,099.8)
-
MMBtu
- -
04 2.6232: Install set-back timers $532 - $416
19,815
kWh
- $116
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $304 - $304
14,439
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $361 $274 $361
5,185
kWh
- - - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $3,372 $3,433 - - $3,372
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $9,815 $23,175 $2,904
138,277
kWh
$661
-
kW-mo/yr
- - $6,250
09 2.4322: Use or replace with energy efficient substitutes $351 $866 $88
4,205
kWh
$86
-
kW-mo/yr
- - $177
10 2.4221: Install compressor air intakes in coolest locations $200 $830 $200
9,536
kWh
- - - -
11 2.7135: Install occupancy sensors $591 $2,569 $591
28,162
kWh
- - - -
12 2.2414: Use waste heat from hot flue gases to preheat $5,144 $37,640 - - $5,144
-
MMBtu
- -
13 2.1321: Replace fossil fuel equipment with electrical equipment $10,975 $162,768 $(-654.4)
(-31,161)
kWh
- - $11,630
-
MMBtu
-
14 2.7447: Install vinyl strip / high speed / air curtain doors $3,778 $21,942 - - $3,778
-
MMBtu
- -
TOTAL RECOMMENDED $60,468 $253,498 $5,155
233,457
kWh
$7,860
-
kW-mo/yr
$11,310
-
MMBtu
$11,630
-
MMBtu
$24,513
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs