ITAC Assessment: MUCM42
ITAC logo
ITAC Assessment: MUCM42
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Protecting occupational health and environment
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6512: Operators of Nonresidential Buildings
Sales Range less than $500
k
# of Employees 150
Plant Area 64,159
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,881 1,074,337
kWh
Electricity Demand $27,041 2,030
kW-mo/yr
Electricity Fees $10,826 -
Natural Gas $4,130 780
MMBtu
Other Gas $234 1
MMBtu
Waste Disposal Costs
Water Usage $2,515 132
Tgal
Water Disposal $18,360 1
Tgal
TOTAL YEARLY COSTS $203,987
RECOMMENDED SAVINGS* $168,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $119,926 $1,385,000 $25,773
196,737
kWh
$17,162
-
kW-mo/yr
- $76,991
02 2.7291: Reschedule and rearrange multiple-source heating systems $36,302 $900 $31,864
243,237
kWh
$4,438
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $2,266 - $1,490
11,372
kWh
$777
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $618 $282 $435
3,318
kWh
$184
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,239 $3,264 $1,471
11,232
kWh
$767
-
kW-mo/yr
- -
06 2.7221: Lower temperature during the winter season and vice-versa $3,638 - - - $3,638
-
MMBtu
-
07 2.7424: Shade windows from summer sun $150 $394 $150
1,142
kWh
- - -
08 3.1161: Eliminate/reduce an operation $3,691 - - - $3,691
-
MMBtu
-
TOTAL RECOMMENDED $168,829 $1,389,840 $61,182
467,039
kWh
$23,327
-
kW-mo/yr
$7,329
-
MMBtu
$76,991
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs