ITAC Assessment: OR0071
ITAC logo
ITAC Assessment: OR0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 52,000
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,153 7,228,019
kWh
Wood $64,260 154,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,403

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,915 $500 - $1,915
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,682 $5,000 $17,682
376,319
kWh
-
03 2.4133: Use most efficient type of electric motors $106 $181 $106
2,345
kWh
-
04 2.3212: Optimize plant power factor $900 $2,250 $900
-
kWh
-
05 2.5123: Reduce fluid flow rates $4,615 $12,560 $4,615
138,628
kWh
-
TOTAL RECOMMENDED $25,218 $20,491 $23,303
517,292
kWh
$1,915
-
MMBtu
TOTAL IMPLEMENTED $22,403 $17,741 $22,403
517,292
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs