ITAC Assessment: OK0472
ITAC logo
ITAC Assessment: OK0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Oil valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 42,000
ft2
Annual Production 3,600
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,031 1,235,053
kWh
Natural Gas $7,664 1,352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,844 $19,582 $10,844
158,265
kWh
- -
02 2.6232: Install set-back timers $4,881 $775 $4,881
252,345
kWh
- -
03 2.4133: Use most efficient type of electric motors $2,501 $5,713 $2,501
44,549
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,180 - $2,180
38,687
kWh
- -
05 2.2437: Recover waste heat from equipment $1,174 $538 - $1,174
-
MMBtu
-
06 2.7241: Install outside air damper / economizer on hvac unit $1,475 $4,275 $1,475
26,084
kWh
- -
07 2.3212: Optimize plant power factor $480 $4,180 - - $480
TOTAL RECOMMENDED $23,535 $35,063 $21,881
519,930
kWh
$1,174
-
MMBtu
$480
TOTAL IMPLEMENTED $19,701 $30,345 $19,701
481,243
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs