ITAC Assessment: UM0375
ITAC logo
ITAC Assessment: UM0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Military Armored Vehicles
NAICS 336992: Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 3795: Tanks and Tank Components
Sales Range greater than $500
M
# of Employees 1,204
Plant Area 1,600,000
ft2
Annual Production 625
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,495,301 51,828,000
kWh
Natural Gas $692,899 107,236
MMBtu
Coal $1,641,600 266,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $195,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $195,184

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $126,231 $236,764 $126,231
2,621,640
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $16,709 $4,000 $16,709
347,020
kWh
- -
03 2.7135: Install occupancy sensors $7,646 $4,232 $7,646
158,802
kWh
- -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $27,796 $140,490 - $2,906
-
MMBtu
$24,890
-
MMBtu
05 2.2437: Recover waste heat from equipment $16,802 $5,500 - $1,756
-
MMBtu
$15,046
-
MMBtu
TOTAL RECOMMENDED $195,184 $390,986 $150,586
3,127,462
kWh
$4,662
-
MMBtu
$39,936
-
MMBtu
TOTAL IMPLEMENTED $195,184 $390,986 $150,586
3,127,462
kWh
$4,662
-
MMBtu
$39,936
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs