| Assessment Year | 1996 |
|---|---|
| Principal Product | Electronic Power Supplies |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
30,000
ft2
|
| Annual Production | 1,224,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $50,480 | 1,677,022 |
kWh
|
$0.030 |
| Electricity Demand | $49,171 | 3,486 |
kW-mo/yr
|
$14.11 |
| Electricity Fees | $3,382 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,019 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,183 | $8,000 |
$5,524
182,884
kWh
|
$11,780
-
kW-mo/yr
|
$(-3,121.0)
-
MMBtu
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,588 | $906 |
$3,320
109,906
kWh
|
$2,268
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $3,200 | $3,480 |
$1,868
180,832
kWh
|
$1,332
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7261: Install timers and/or thermostats | $732 | $300 |
$732
24,326
kWh
|
- | - | - | - | |
| 05 | 2.7292: Lower ceiling to reduce conditioned space | $427 | $400 |
$427
14,068
kWh
|
- | - | - | - | |
| 06 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $5,889 | $3,200 | - | - | - |
$2,149
-
gal
|
$3,740
-
lb
|
|
| TOTAL RECOMMENDED | $30,019 | $16,286 |
$11,871
512,016
kWh
|
$15,380
-
kW-mo/yr
|
$(-3,121.0)
-
MMBtu
|
$2,149
-
gal
|
$3,740
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs