ITAC Assessment: OR0832
ITAC logo
ITAC Assessment: OR0832
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Steam, Electricity
NAICS 221112: Fossil Fuel Electric Power Generation
SIC 4931: Electric and Other Services Combined
Sales Range less than $500
k
# of Employees 10
Plant Area 21,575
ft2
Annual Production 548,216
units
Production Hrs. Annual 8,592
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $783,637 3,870,165
kWh
Natural Gas $4,134,068 881,659
MMBtu
Waste Disposal Costs
Water Usage $36,000 9,972
Tgal
TOTAL YEARLY COSTS $4,953,705
RECOMMENDED SAVINGS* $92,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 3.1161: Eliminate/reduce an operation $32,217 $26,036 - $32,217
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,144 $8,340 $5,144
91,849
kWh
-
03 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $23,710 $48,334 $36,691
655,200
kWh
$(-12,981.0)
-
MMBtu
04 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $31,560 $243,649 $55,989
999,806
kWh
$(-24,429.0)
-
MMBtu
TOTAL RECOMMENDED $92,631 $326,359 $97,824
1,746,855
kWh
$(-5,193.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs