ITAC Assessment: WM0255
ITAC logo
ITAC Assessment: WM0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Thermal Paper
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 930,128
ft2
Annual Production 81,613
ton
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,554,696 39,857,769
kWh
Electricity Demand $987,408 87,754
kW-mo/yr
Natural Gas $3,002,204 982,867
MMBtu
Waste Disposal Costs
Water Usage $196,480 22,949
Tgal
TOTAL YEARLY COSTS $6,740,788
RECOMMENDED SAVINGS* $253,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2113: Repair or replace steam traps $169,641 $20,561 - - $169,641
-
MMBtu
-
02 2.4322: Use or replace with energy efficient substitutes $34,848 $200,000 $29,818
465,913
kWh
$5,030
-
kW-mo/yr
- -
03 2.1223: Install smaller boiler (increase high fire duty cycle) $34,808 $250,000 - - $29,808
-
MMBtu
$5,000
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $13,473 $75,000 - - $13,473
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,026 $2,200 $878
13,724
kWh
$148
-
kW-mo/yr
- -
TOTAL RECOMMENDED $253,796 $547,761 $30,697
479,637
kWh
$5,178
-
kW-mo/yr
$212,922
-
MMBtu
$5,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs