| Assessment Year | 2026 |
|---|---|
| Principal Product | Thermal Paper |
| NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
| SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 250 |
| Plant Area |
930,128
ft2
|
| Annual Production | 81,613
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $2,554,696 | 39,857,769 |
kWh
|
$0.064 | |
| Electricity Demand | $987,408 | 87,754 |
kW-mo/yr
|
$11.25 | |
| Natural Gas | $3,002,204 | 982,867 |
MMBtu
|
$3.05 | |
| Waste Disposal Costs | |||||
| Water Usage | $196,480 | 22,949 |
Tgal
|
$8.56 | |
| TOTAL YEARLY COSTS | $6,740,788 | ||||
| RECOMMENDED SAVINGS* | $253,796 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $169,641 | $20,561 | - | - |
$169,641
-
MMBtu
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $34,848 | $200,000 |
$29,818
465,913
kWh
|
$5,030
-
kW-mo/yr
|
- | - | |
| 03 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $34,808 | $250,000 | - | - |
$29,808
-
MMBtu
|
$5,000 | |
| 04 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $13,473 | $75,000 | - | - |
$13,473
-
MMBtu
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,026 | $2,200 |
$878
13,724
kWh
|
$148
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $253,796 | $547,761 |
$30,697
479,637
kWh
|
$5,178
-
kW-mo/yr
|
$212,922
-
MMBtu
|
$5,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs