Assessment Year | 2018 |
---|---|
Principal Product | Hinges and drawer slides |
NAICS | 332510: Hardware Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 223 |
Plant Area |
165,000
ft2
|
Annual Production | 32,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $276,088 | 5,334,266 |
kWh
|
$0.052 |
Electricity Demand | $119,312 | 14,763 |
kW-mo/yr
|
$8.08 |
Natural Gas | $68,193 | 6,985 |
MMBtu
|
$9.76 |
TOTAL YEARLY COSTS | $463,593 | |||
RECOMMENDED SAVINGS* | $85,291 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,744 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37,748 | $34,821 |
$30,911
596,743
kWh
|
$6,837
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $211 | $350 |
$211
4,082
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,617 | $100 |
$8,039
155,186
kWh
|
$1,778
-
kW-mo/yr
|
- | $(-1,200.0) | $(-1,000.0) | |
04 | 2.4239: Eliminate or reduce compressed air usage | $1,718 | $1,800 |
$1,718
33,160
kWh
|
- | - | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $4,198 | $15,000 |
$3,437
66,360
kWh
|
$761
-
kW-mo/yr
|
- | - | - | |
06 | 2.4226: Use / purchase optimum sized compressor | $1,488 | - |
$1,218
23,520
kWh
|
$270
-
kW-mo/yr
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $1,952 | $4,000 | - | - |
$1,952
-
MMBtu
|
- | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $25,721 | $500 |
$25,721
-
kWh
|
- | - | - | - | |
09 | 2.4154: Avoid rewinding motors more than twice | $3,477 | $5,865 |
$2,847
54,960
kWh
|
$630
-
kW-mo/yr
|
- | - | - | |
10 | 2.1221: Replace obsolete burners with more efficient ones | $1,161 | $5,000 | - | - |
$1,161
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $85,291 | $67,436 |
$74,102
934,011
kWh
|
$10,276
-
kW-mo/yr
|
$3,113
-
MMBtu
|
$(-1,200.0) | $(-1,000.0) | ||
TOTAL IMPLEMENTED | $38,744 | $8,615 |
$38,536
247,388
kWh
|
$2,408
-
kW-mo/yr
|
- | $(-1,200.0) | $(-1,000.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs