Assessment Year | 2017 |
---|---|
Principal Product | Ground Coffee |
NAICS | 311920: Coffee and Tea Manufacturing |
SIC | 2095: Roasted Coffee |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
503,700
ft2
|
Annual Production | 41,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,121,771 | 16,083,000 |
kWh
|
$0.070 |
Electricity Demand | $228,032 | 29,372 |
kW-mo/yr
|
$7.76 |
Natural Gas | $945,988 | 256,365 |
MMBtu
|
$3.69 |
TOTAL YEARLY COSTS | $2,295,791 | |||
RECOMMENDED SAVINGS* | $85,612 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $28,766 | $12,000 | - |
$28,766
-
MMBtu
|
|
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,205 | $920 |
$2,205
31,608
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $993 | $548 | - |
$993
-
MMBtu
|
|
04 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $21,748 | $15,200 |
$21,748
311,801
kWh
|
- | |
05 | 2.1241: Reduce excessive boiler blowdown | $3,685 | $4,250 | - |
$3,685
-
MMBtu
|
|
06 | 2.7425: Clean or color roof to reduce solar load | $28,215 | $80,000 |
$28,215
404,804
kWh
|
- | |
TOTAL RECOMMENDED | $85,612 | $112,918 |
$52,168
748,213
kWh
|
$33,444
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs