ITAC Assessment: WV0064
ITAC logo
ITAC Assessment: WV0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Glass tubes for light bulbs and Picture tubes
NAICS
n/a
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 160,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $906,771 14,525,498
kWh
Natural Gas $800,551 185,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,667

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,055 $630 $2,055
53,634
kWh
- -
02 2.2437: Recover waste heat from equipment $14,990 $3,690 - $14,990
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,062 $500 $4,062
106,096
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $863 $480 $863
22,567
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,577 $35 $4,577
119,578
kWh
- -
06 2.2136: Install / repair insulation on steam lines $6,143 $2,745 - $6,143
-
MMBtu
-
07 2.7491: Insulate glazing, walls, ceilings, and roofs $150 $255 $150
3,810
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $544 $180 $544
14,068
kWh
- -
09 3.1161: Eliminate/reduce an operation $7,837 - - - $7,837
-
lb
TOTAL RECOMMENDED $41,221 $8,515 $12,251
319,753
kWh
$21,133
-
MMBtu
$7,837
-
lb
TOTAL IMPLEMENTED $13,667 $4,535 $7,524
196,365
kWh
$6,143
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs