Assessment Year | 2003 |
---|---|
Principal Product | Furniture |
NAICS | 337211: Wood Office Furniture Manufacturing |
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 495 |
Plant Area |
476,898
ft2
|
Annual Production | 80,000
pieces
|
Production Hrs. Annual | 3,950
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $227,875 | 9,265,260 |
kWh
|
$0.025 |
Electricity Demand | $379,919 | 29,001 |
kW-mo/yr
|
$13.10 |
Electricity Fees | $27,910 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,858 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,713 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,713 | - |
$2,606
104,231
kWh
|
$6,107
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,485 | - |
$829
33,164
kWh
|
$1,656
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $715 | $213 |
$298
11,925
kWh
|
$417
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,759 | $950 |
$463
18,539
kWh
|
$1,296
-
kW-mo/yr
|
- | |
05 | 2.3212: Optimize plant power factor | $10,041 | $7,458 | - | - | $10,041 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,145 | $27,936 |
$2,882
115,265
kWh
|
$7,263
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $33,858 | $36,557 |
$7,078
283,124
kWh
|
$16,739
-
kW-mo/yr
|
$10,041 | ||
TOTAL IMPLEMENTED | $23,713 | $8,621 |
$4,196
167,859
kWh
|
$9,476
-
kW-mo/yr
|
$10,041 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs