ITAC Assessment: SU0171
ITAC logo
ITAC Assessment: SU0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 495
Plant Area 476,898
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 3,950
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,875 9,265,260
kWh
Electricity Demand $379,919 29,001
kW-mo/yr
Electricity Fees $27,910 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,713 - $2,606
104,231
kWh
$6,107
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,485 - $829
33,164
kWh
$1,656
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $715 $213 $298
11,925
kWh
$417
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,759 $950 $463
18,539
kWh
$1,296
-
kW-mo/yr
-
05 2.3212: Optimize plant power factor $10,041 $7,458 - - $10,041
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,145 $27,936 $2,882
115,265
kWh
$7,263
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,858 $36,557 $7,078
283,124
kWh
$16,739
-
kW-mo/yr
$10,041
TOTAL IMPLEMENTED $23,713 $8,621 $4,196
167,859
kWh
$9,476
-
kW-mo/yr
$10,041
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs