ITAC Assessment: MS0464
ITAC logo
ITAC Assessment: MS0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Rocker Chair Hardware
NAICS 332510: Hardware Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 251,000
ft2
Annual Production 564,200
units
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $355,599 3,043,865
kWh
Electricity Demand $182,709 13,366
kW-mo/yr
Electricity Fees $3,403 -
Natural Gas $170,285 28,591
MMBtu
Waste Disposal Costs
Water Usage $4,217 1,008
Tgal
Water Disposal $2,942 1,008
Tgal
TOTAL YEARLY COSTS $719,155
RECOMMENDED SAVINGS* $101,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $14,662 $50,000 - $14,662
-
kW-mo/yr
- -
02 2.7229: Air condition only space necessary $65,105 $17,298 $(-172.0)
(-1,471)
kWh
- - $65,277
-
MMBtu
03 3.1161: Eliminate/reduce an operation $1,157 - - - $1,157 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,762 $2,243 $1,762
15,060
kWh
- - -
05 2.8121: Apply for tax-free status for energy purchases $5,325 - - - $5,325 -
06 2.6218: Turn off equipment when not in use $13,526 - $13,526
115,604
kWh
- - -
TOTAL RECOMMENDED $101,537 $69,541 $15,116
129,193
kWh
$14,662
-
kW-mo/yr
$6,482 $65,277
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs