ITAC Assessment: SU0604
ITAC logo
ITAC Assessment: SU0604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Tungsten & Tungsten Carbide Powder
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 55
Plant Area 200,000
ft2
Annual Production 882
ton
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,350 12,126,652
kWh
Electricity Demand $266,426 19,620
kW-mo/yr
Electricity Fees $146,281 -
Natural Gas $12,211 1,827
MMBtu
LPG $10,989 399
MMBtu
Other Gas $502 1
MMBtu
TOTAL YEARLY COSTS $704,759
RECOMMENDED SAVINGS* $28,085 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,321 - - $13,321
-
kW-mo/yr
- -
02 3.1161: Eliminate/reduce an operation $659 - $210
9,563
kWh
$713
-
kW-mo/yr
$(-264.5)
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $75 - $75
3,418
kWh
- - -
04 2.6232: Install set-back timers $2,143 $222 $1,528
69,448
kWh
- $615
-
MMBtu
-
05 2.2511: Insulate bare equipment $745 $2,083 $491
22,315
kWh
- $254
-
MMBtu
-
06 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $587 $1,742 $587
26,702
kWh
- - -
07 2.1321: Replace fossil fuel equipment with electrical equipment $7,137 $24,539 $(-3,852.2)
(-175,102)
kWh
- - $10,989
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,371 $19,740 $3,371
153,212
kWh
- - -
09 2.6211: Conserve energy by efficient use of vending machines $47 $341 $47
2,146
kWh
- - -
TOTAL RECOMMENDED $28,085 $48,667 $2,457
111,703
kWh
$14,034
-
kW-mo/yr
$605
-
MMBtu
$10,989
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs