Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23,009 matching assessments
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
WV0278 2003 Processed vegetables 13 $1,369k $213k
UU0054 2003 Mattresses 7 $52k $14k
WV0277 2003 Poultry fat and feather mill 12 $3,801k $405k
LE0171 2003 Metal stamping 8 $286k $30k
SU0166 2003 Transportation parts 7 $291k $148k
UF0329 2003 Aluminum automotive parts 11 $260k $2,050k
WI0451 2003 35000 7 $2,640k $59k
OK0669 2003 Hydraulic motors 7 $906k $126k
UD0680 2003 Radiators for medium and heavy duty trucks 17 $962k $97k
AM0444 2003 Landscape mulch 5 $101k $17k
BD0242 2003 Color concentrates for plastics 13 $335k $42k
BD0241 2003 Sheet and rollstock plastic 16 $516k $59k
LE0170 2003 Insulation facings (paper laminate) 6 $649k $215k
UD0679 2003 Aluminum beverage cans 11 $2,145k $350k
UM0241 2003 Injection molded plastics 6 $185k $610k
UU0053 2003 Rocket motors 6 $648k $38k
LE0169 2003 Extruded plastic tubing 6 $102k $8.5k
IA0326 2003 Asphalt 8 $1,065k $16k
SU0165 2003 Marine, industrial hardware 7 $998k $269k
MS0233 2003 Industrial boilers 9 $840k $323k