ITAC Assessment: BD0242
ITAC logo
ITAC Assessment: BD0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Color Concentrates for Plastics
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 69
Plant Area 56,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,562 6,286,549
kWh
Electricity Demand $23,518 12,791
kW-mo/yr
Natural Gas $28,227 3,142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,744 $17,700 n/a $5,475
168,980
kWh
$426
-
kW-mo/yr
- - $2,843 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,232 $900 $5,785
178,477
kWh
$447
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $4,183 $11,800 $3,946
121,589
kWh
$237
-
kW-mo/yr
- - - -
04 2.2437: Recover waste heat from equipment $1,274 $500 - - $1,274
-
MMBtu
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,151 $1,340 $1,087
33,558
kWh
$64
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $835 $201 $423
13,061
kWh
$34
-
kW-mo/yr
- - $136 $242
07 2.7135: Install occupancy sensors $747 $1,725 $653
20,125
kWh
$94
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $324 $200 $183
5,637
kWh
$6
-
kW-mo/yr
- - $49 $86
09 3.5315: Lease / purchase baler; sell cardboard to recycler $2,468 $1,500 - - - $2,120
-
lb
$348 -
10 4.213: Purchase material from supplier in customized packaging $8,400 $1,000 - - - - - $8,400
11 3.5316: Contract a wood pallet recycling company $4,200 $248 - - - $4,200
-
lb
- -
12 4.447: Automate payroll system $2,402 $1,500 - - - - $2,402 -
13 3.5212: Regrind, reuse, or sell scrap plastic parts $1,500 $248 - - - $1,500
-
lb
- -
TOTAL RECOMMENDED $42,460 $38,862 $17,552
541,427
kWh
$1,308
-
kW-mo/yr
$1,274
-
MMBtu
$7,820
-
lb
$5,778 $8,728
TOTAL IMPLEMENTED $13,164 $14,740 $11,001
339,261
kWh
$754
-
kW-mo/yr
$1,274
-
MMBtu
- $49 $86
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs