| Assessment Year | 1994 |
|---|---|
| Principal Product | Locks |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
145,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $251,430 | 4,536,049 |
kWh
|
$0.055 |
| Natural Gas | $189,986 | 40,314 |
MMBtu
|
$4.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,733 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,535 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,128 | $450 |
$3,128
56,858
kWh
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $6,058 | $800 |
$6,058
110,199
kWh
|
- | |
| 03 | 2.1213: Direct warmest air to combustion intake | $989 | $980 | - |
$989
-
MMBtu
|
|
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $3,504 | $8,400 | - |
$3,504
-
MMBtu
|
|
| 05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $705 | $1,624 |
$705
12,896
kWh
|
- | |
| 06 | 2.2443: Re-use or recycle hot or cold process exhaust air | $11,775 | $7,000 | - |
$11,775
-
MMBtu
|
|
| 07 | 2.2511: Insulate bare equipment | $9,420 | $1,500 | - |
$9,420
-
MMBtu
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,154 | $2,128 |
$4,154
75,615
kWh
|
- | |
| TOTAL RECOMMENDED | $39,733 | $22,882 |
$14,045
255,568
kWh
|
$25,688
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $34,535 | $11,878 |
$13,340
242,672
kWh
|
$21,195
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs