ITAC Assessment: NC0038
ITAC logo
ITAC Assessment: NC0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Locks
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 145,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,430 4,536,049
kWh
Natural Gas $189,986 40,314
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,128 $450 $3,128
56,858
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $6,058 $800 $6,058
110,199
kWh
-
03 2.1213: Direct warmest air to combustion intake $989 $980 - $989
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $3,504 $8,400 - $3,504
-
MMBtu
05 2.2614: Use cooling tower or economizer to replace chiller cooling $705 $1,624 $705
12,896
kWh
-
06 2.2443: Re-use or recycle hot or cold process exhaust air $11,775 $7,000 - $11,775
-
MMBtu
07 2.2511: Insulate bare equipment $9,420 $1,500 - $9,420
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,154 $2,128 $4,154
75,615
kWh
-
TOTAL RECOMMENDED $39,733 $22,882 $14,045
255,568
kWh
$25,688
-
MMBtu
TOTAL IMPLEMENTED $34,535 $11,878 $13,340
242,672
kWh
$21,195
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs