Assessment Year | 1990 |
---|---|
Principal Product | MEN'S SUITS,SPORTS COATS |
NAICS |
n/a
|
SIC | 2311: Men's and Boys' Suits, Coats, and Overcoats |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 312,000
pieces
|
Production Hrs. Annual | 2,160
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,634 | 2,919,695 |
kWh
|
$0.062 |
Natural Gas | $60,190 | 18,484 |
MMBtu
|
$3.26 |
Fuel Oil #2 | $9,345 | 1,470 |
MMBtu
|
$6.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,933 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,933 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $10,212 | $1,840 |
$10,212
164,713
kWh
|
- | - | - | |
02 | 2.7123: Keep lamps and reflectors clean | $8,262 | - |
$7,668
123,681
kWh
|
- | - | $594 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $710 | $628 |
$710
11,430
kWh
|
- | - | - | |
04 | 2.2153: Close off unneeded steam lines | $762 | - | - |
$667
-
MMBtu
|
$95
-
MMBtu
|
- | |
05 | 2.6232: Install set-back timers | $3,562 | - |
$3,562
57,444
kWh
|
- | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $399 | - | - |
$399
-
MMBtu
|
- | - | |
07 | 2.2163: Use minimum steam operating pressure | $319 | - | - |
$281
-
MMBtu
|
$38
-
MMBtu
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,254 | - |
$1,254
20,223
kWh
|
- | - | - | |
09 | 2.2122: Install / repair insulation on condensate lines | $122 | $25 | - |
$109
-
MMBtu
|
$13
-
MMBtu
|
- | |
10 | 2.2531: Re-size charging openings or add movable cover or door | $69 | - | - |
$63
-
MMBtu
|
$6
-
MMBtu
|
- | |
11 | 2.2511: Insulate bare equipment | $62 | $146 | - |
$56
-
MMBtu
|
$6
-
MMBtu
|
- | |
12 | 2.6232: Install set-back timers | $200 | $410 |
$200
3,224
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $25,933 | $3,049 |
$23,606
380,715
kWh
|
$1,575
-
MMBtu
|
$158
-
MMBtu
|
$594 | ||
TOTAL IMPLEMENTED | $25,933 | $3,049 |
$23,606
380,715
kWh
|
$1,575
-
MMBtu
|
$158
-
MMBtu
|
$594 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs