ITAC Assessment: TN0418
ITAC logo
ITAC Assessment: TN0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MEN'S SUITS,SPORTS COATS
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 312,000
pieces
Production Hrs. Annual 2,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,634 2,919,695
kWh
Natural Gas $60,190 18,484
MMBtu
Fuel Oil #2 $9,345 1,470
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7226: Use computer programs to optimize hvac performance $10,212 $1,840 $10,212
164,713
kWh
- - -
02 2.7123: Keep lamps and reflectors clean $8,262 - $7,668
123,681
kWh
- - $594
03 2.7142: Utilize higher efficiency lamps and/or ballasts $710 $628 $710
11,430
kWh
- - -
04 2.2153: Close off unneeded steam lines $762 - - $667
-
MMBtu
$95
-
MMBtu
-
05 2.6232: Install set-back timers $3,562 - $3,562
57,444
kWh
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $399 - - $399
-
MMBtu
- -
07 2.2163: Use minimum steam operating pressure $319 - - $281
-
MMBtu
$38
-
MMBtu
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,254 - $1,254
20,223
kWh
- - -
09 2.2122: Install / repair insulation on condensate lines $122 $25 - $109
-
MMBtu
$13
-
MMBtu
-
10 2.2531: Re-size charging openings or add movable cover or door $69 - - $63
-
MMBtu
$6
-
MMBtu
-
11 2.2511: Insulate bare equipment $62 $146 - $56
-
MMBtu
$6
-
MMBtu
-
12 2.6232: Install set-back timers $200 $410 $200
3,224
kWh
- - -
TOTAL RECOMMENDED $25,933 $3,049 $23,606
380,715
kWh
$1,575
-
MMBtu
$158
-
MMBtu
$594
TOTAL IMPLEMENTED $25,933 $3,049 $23,606
380,715
kWh
$1,575
-
MMBtu
$158
-
MMBtu
$594
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs