ITAC Assessment: MS0023
ITAC logo
ITAC Assessment: MS0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Superabsorbant Polymers
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 65,892
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $537,663 10,866,354
kWh
Natural Gas $215,611 75,289
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,086 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $7,796 $4,500 $7,796
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $606 $2,134 $606
8,206
kWh
-
03 2.4133: Use most efficient type of electric motors $6,350 $43,100 $6,350
128,957
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $918 $2,400 - $918
-
MMBtu
05 2.7261: Install timers and/or thermostats $577 $690 $577
19,343
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $839 $120 $839
27,843
kWh
-
TOTAL RECOMMENDED $17,086 $52,944 $16,168
184,349
kWh
$918
-
MMBtu
TOTAL IMPLEMENTED $839 $120 $839
27,843
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs