ITAC Assessment: ME0156
ITAC logo
ITAC Assessment: ME0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $5
M
to 10
M
# of Employees 118
Plant Area 28,000
ft2
Annual Production 92,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,480 851,700
kWh
LPG $543 36
MMBtu
Fuel Oil #2 $12,158 2,115
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,472 $9,385 $9,472
94,373
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,175 $460 $5,528
55,686
kWh
$(-353.0)
-
MMBtu
-
03 3.5217: Reuse / recycle/ sell paper products $2,945 $832 - - $2,945
-
lb
04 3.5316: Contract a wood pallet recycling company $750 - - - $750
-
lb
TOTAL RECOMMENDED $18,342 $10,677 $15,000
150,059
kWh
$(-353.0)
-
MMBtu
$3,695
-
lb
TOTAL IMPLEMENTED $17,592 $10,677 $15,000
150,059
kWh
$(-353.0)
-
MMBtu
$2,945
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs