ITAC Assessment: MS0443
ITAC logo
ITAC Assessment: MS0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Optical Lenses
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 25,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,967 2,166,360
kWh
Electricity Demand $56,159 5,778
kW-mo/yr
Electricity Fees $105,703 -
Natural Gas $289 795
MMBtu
LPG $1,936 76
MMBtu
Waste Disposal Costs
Water Usage $4,976 476
Tgal
TOTAL YEARLY COSTS $244,031
RECOMMENDED SAVINGS* $84,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Primary Product Savings
01 2.9114: Use solar heat to make electricty $31,318 $433,405 $22,380
639,430
kWh
$8,938
-
kW-mo/yr
- -
02 4.631: Install an uninteruptable power supply $51,282 $1,786,854 - - - $51,282
03 2.1321: Replace fossil fuel equipment with electrical equipment $1,762 $50,000 $(-174.7)
(-4,992)
kWh
- $1,936
-
MMBtu
-
TOTAL RECOMMENDED $84,362 $2,270,259 $22,205
634,438
kWh
$8,938
-
kW-mo/yr
$1,936
-
MMBtu
$51,282
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs