Assessment Year | 2003 |
---|---|
Principal Product | mattresses |
NAICS | 337910: Mattress Manufacturing |
SIC | 3764: Guided Missile and Space Vehicle Propulsion Units and Propulsion Unit Parts |
Sales Range | $5 M to 10M |
# of Employees | 47 |
Plant Area |
94,000
ft2
|
Annual Production | 48,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $13,999 | 498,360 |
kWh
|
$0.028 |
Electricity Demand | $18,845 | 2,361 |
kW-mo/yr
|
$7.98 |
Electricity Fees | $5,847 | - |
|
- |
Natural Gas | $13,678 | 2,376 |
MMBtu
|
$5.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,078 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $170 | $698 | n/a | - | - | - |
$170
-
MMBtu
|
02 | 2.4221: Install compressor air intakes in coolest locations | $185 | $130 | n/a |
$69
2,300
kWh
|
$116
-
kW-mo/yr
|
- | - |
03 | 2.7111: Reduce illumination to minimum necessary levels | $3,707 | - | n/a |
$1,381
42,557
kWh
|
$2,326
-
kW-mo/yr
|
- | - |
04 | 2.3212: Optimize plant power factor | $1,487 | $720 | n/a | - | - | $1,487 | - |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $3,909 | $3,500 | n/a |
$(-92.0)
(-2,822)
kWh
|
$(-41.0)
-
kW-mo/yr
|
- |
$4,042
-
MMBtu
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $868 | $10,415 | n/a |
$324
9,964
kWh
|
$544
-
kW-mo/yr
|
- | - |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,752 | - | n/a | - |
$3,752
-
kW-mo/yr
|
- | - |
TOTAL RECOMMENDED | $14,078 | $15,463 |
$1,682
51,999
kWh
|
$6,697
-
kW-mo/yr
|
$1,487 |
$4,212
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs