| Assessment Year | 2003 |
|---|---|
| Principal Product | transportation parts |
| NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
241,969
ft2
|
| Annual Production | 350,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $235,284 | 4,842,000 |
kWh
|
$0.049 |
| Electricity Demand | $55,762 | 9,360 |
kW-mo/yr
|
$5.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $147,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $40,125 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $5,012 | $232 |
$4,255
69,960
kWh
|
$757
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,388 | $480 |
$4,430
88,612
kWh
|
$958
-
kW-mo/yr
|
- | - | - | |
| 03 | 4.425: Eliminate/reduce redundant inspections | $28,125 | $10,016 | - | - | $28,125 | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,270 | $24,797 |
$20,364
407,280
kWh
|
$3,906
-
kW-mo/yr
|
- | - | - | |
| 05 | 4.522: Modify storage space to avoid rental of a warehouse | $24,000 | $19,912 | - | - | - | - | $24,000 | |
| 06 | 2.3322: Use existing dam to generate electricity | $49,025 | $132,000 |
$39,600
792,000
kWh
|
$9,425
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7232: Replace existing hvac unit with high efficiency model | $12,000 | $68,560 | - | - | - |
$12,000
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $147,820 | $255,997 |
$68,649
1,357,852
kWh
|
$15,046
-
kW-mo/yr
|
$28,125 |
$12,000
-
Tgal
|
$24,000 | ||
| TOTAL IMPLEMENTED | $40,125 | $78,576 | - | - | $28,125 |
$12,000
-
Tgal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs