Assessment Year | 2003 |
---|---|
Principal Product | Insulation Facings (Paper Laminate) |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | n/a |
# of Employees | 103 |
Plant Area |
155,000
ft2
|
Annual Production | 1,000,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $376,987 | 5,130,800 |
kWh
|
$0.073 |
Electricity Demand | $146,189 | 15,496 |
kW-mo/yr
|
$9.43 |
Natural Gas | $126,243 | 14,518 |
MMBtu
|
$8.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $215,254 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,966 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $210,423 | $300,000 |
$168,780
2,296,320
kWh
|
$41,643
-
kW-mo/yr
|
- | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,647 | $7,000 |
$2,647
36,016
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $952 | - |
$952
12,948
kWh
|
- | - | |
04 | 2.2625: Chill water to the highest temperature possible | $367 | - |
$367
4,992
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $440 | $560 | - | - |
$440
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $425 | $825 |
$425
5,781
kWh
|
- | - | |
TOTAL RECOMMENDED | $215,254 | $308,385 |
$173,171
2,356,057
kWh
|
$41,643
-
kW-mo/yr
|
$440
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,966 | $7,000 |
$3,966
53,956
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs