Assessment Year | 2003 |
---|---|
Principal Product | rocket motors |
NAICS | 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
120,000
ft2
|
Annual Production | 100
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $357,248 | 12,790,052 |
kWh
|
$0.028 |
Electricity Demand | $24,415 | 36,444 |
kW-mo/yr
|
$0.67 |
Electricity Fees | $58,286 | - |
|
- |
Natural Gas | $207,857 | 39,331 |
MMBtu
|
$5.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,786 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,869 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,354 | $4,100 |
$655
21,371
kWh
|
$699
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,131 | $55 |
$7,949
261,100
kWh
|
$3,182
-
kW-mo/yr
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,710 | $2,000 | - | - |
$3,710
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,112 | $70,635 |
$8,092
220,600
kWh
|
$1,020
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,869 | $2,340 |
$5,356
176,000
kWh
|
$4,513
-
kW-mo/yr
|
- | |
06 | 2.1222: Install turbulators | $2,610 | $1,572 | - | - |
$2,610
-
MMBtu
|
|
TOTAL RECOMMENDED | $37,786 | $80,702 |
$22,052
679,071
kWh
|
$9,414
-
kW-mo/yr
|
$6,320
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,869 | $2,340 |
$5,356
176,000
kWh
|
$4,513
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs