ITAC Assessment: UU0053
ITAC logo
ITAC Assessment: UU0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product rocket motors
NAICS 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 120,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $357,248 12,790,052
kWh
Electricity Demand $24,415 36,444
kW-mo/yr
Electricity Fees $58,286 -
Natural Gas $207,857 39,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,786 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,869

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,354 $4,100 $655
21,371
kWh
$699
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $11,131 $55 $7,949
261,100
kWh
$3,182
-
kW-mo/yr
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,710 $2,000 - - $3,710
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,112 $70,635 $8,092
220,600
kWh
$1,020
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,869 $2,340 $5,356
176,000
kWh
$4,513
-
kW-mo/yr
-
06 2.1222: Install turbulators $2,610 $1,572 - - $2,610
-
MMBtu
TOTAL RECOMMENDED $37,786 $80,702 $22,052
679,071
kWh
$9,414
-
kW-mo/yr
$6,320
-
MMBtu
TOTAL IMPLEMENTED $9,869 $2,340 $5,356
176,000
kWh
$4,513
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs