ITAC Assessment: UD0103
ITAC logo
ITAC Assessment: UD0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PIANO PLATES
NAICS
n/a
SIC 3931: Musical Instruments
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 125,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $451,335 10,160,024
kWh
Natural Gas $95,191 20,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,288 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.2711: Utilize outside air instead of conditioned air for drying $7,752 $10,000 $7,752
-
MMBtu
02 2.2437: Recover waste heat from equipment $7,536 $20,000 $7,536
-
MMBtu
TOTAL RECOMMENDED $15,288 $30,000 $15,288
-
MMBtu
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs