| Assessment Year | 1999 |
|---|---|
| Principal Product | Dust Collection Systems and Replacement Parts |
| NAICS |
n/a
|
| SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 84 |
| Plant Area |
68,380
ft2
|
| Annual Production | 200,240
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $31,528 | 663,540 |
kWh
|
$0.048 |
| Electricity Demand | $23,705 | 3,257 |
kW-mo/yr
|
$7.28 |
| Electricity Fees | $1,200 | - |
|
- |
| Natural Gas | $10,815 | 2,237 |
MMBtu
|
$4.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,972 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,197 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $187 | $197 |
$80
2,345
kWh
|
$104
-
kW-mo/yr
|
$3 | - | - | - | |
| 02 | 2.6214: Shut off pilots in standby equipment | $884 | $80 | - | - | - |
$884
-
MMBtu
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $1,777 | $1,994 | - | - | - |
$1,777
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,462 | $266 |
$2,426
74,736
kWh
|
- | $36 | - | - | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $3,832 | $3,788 |
$1,592
48,945
kWh
|
$2,183
-
kW-mo/yr
|
$57 | - | - | - | |
| 06 | 2.4314: Use synthetic lubricant | $4,376 | $825 |
$709
21,102
kWh
|
$820
-
kW-mo/yr
|
- | - |
$1,180
-
gal
|
$1,667 | |
| 07 | 3.6124: Burn waste oil for heat | $1,399 | $2,555 | - | - | - |
$141
-
MMBtu
|
$1,258
-
gal
|
- | |
| 08 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $18,055 | $720 | - | - | - | - |
$18,055
-
gal
|
- | |
| TOTAL RECOMMENDED | $32,972 | $10,425 |
$4,807
147,128
kWh
|
$3,107
-
kW-mo/yr
|
$96 |
$2,802
-
MMBtu
|
$20,493
-
gal
|
$1,667 | ||
| TOTAL IMPLEMENTED | $27,197 | $7,045 |
$4,098
126,026
kWh
|
$2,287
-
kW-mo/yr
|
$96 |
$2,661
-
MMBtu
|
$18,055
-
gal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs