ITAC Assessment: UF0553
ITAC logo
ITAC Assessment: UF0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 2
Plant Area 25,500
ft2
Annual Production 118,990,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,723 2,391,480
kWh
Electricity Demand $32,273 5,423
kW-mo/yr
TOTAL YEARLY COSTS $109,996
RECOMMENDED SAVINGS* $425,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,186

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings By-product Production Savings
01 4.446: Automate finishing process $20,196 $46,226 $20,196
612,014
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,460 $28,443 $6,460
195,758
kWh
- - -
03 2.4112: Install soft-start to eliminate nuisance trips $1,490 $5,608 $1,490
45,156
kWh
- - -
04 4.122: Develop standard procedures to improve internal yields $395,494 $1,875,550 $(-3,614.0)
(-109,500)
kWh
$(-892.0)
-
kW-mo/yr
- $400,000
05 4.662: Level one – add communication using iiot devices to existing control system to modify operations $2,236 - - - $2,236 -
TOTAL RECOMMENDED $425,876 $1,955,827 $24,532
743,428
kWh
$(-892.0)
-
kW-mo/yr
$2,236 $400,000
TOTAL IMPLEMENTED $10,186 $34,051 $7,950
240,914
kWh
- $2,236 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs