ITAC Assessment: TN0616
ITAC logo
ITAC Assessment: TN0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Hydraulic pressing systems
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 30,000
ft2
Annual Production 10
pieces
Production Hrs. Annual 2,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,697 586,460
kWh
Electricity Demand $14,500 3,196
kW-mo/yr
Electricity Fees $5,208 -
Natural Gas $21,529 3,198
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.122: Develop standard procedures to improve internal yields $60,000 $19,780 - - - - - $(-100,000.0) - $160,000
02 3.2124: Convert to air assisted / airless paint guns $7,980 $13,100 - - - - - - $7,980 -
03 2.7231: Use radiant heater for spot heating $6,870 $10,000 - $6,870
-
MMBtu
- - - - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $4,930 - - - - $7,800
-
lb
$(-1,950.0) - $(-920.0) -
05 3.4116: Meter recycled water (to reduce sewer charges) $1,400 $3,700 - - $1,400
-
Tgal
- - - - -
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,140 $640 $1,140
24,326
kWh
- - - - - - -
07 3.5248: Separate and recycle scrap metal to foundry or for sale $900 - - - - $900
-
lb
- - - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $870 $2,500 - $870
-
MMBtu
- - - - - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $140 - $140
2,931
kWh
- - - - - - -
TOTAL RECOMMENDED $84,230 $49,720 $1,280
27,257
kWh
$7,740
-
MMBtu
$1,400
-
Tgal
$8,700
-
lb
$(-1,950.0) $(-100,000.0) $7,060 $160,000
TOTAL IMPLEMENTED $66,210 $20,420 $1,280
27,257
kWh
- - $7,800
-
lb
$(-1,950.0) $(-100,000.0) $(-920.0) $160,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs