| Assessment Year | 2003 |
|---|---|
| Principal Product | Hydraulic motors |
| NAICS | 333996: Fluid Power Pump and Motor Manufacturing |
| SIC | 3594: Fluid Power Pumps and Motors |
| Sales Range | $1 M to 5M |
| # of Employees | 350 |
| Plant Area |
223,600
ft2
|
| Annual Production | 338,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $501,929 | 20,097,600 |
kWh
|
$0.025 |
| Electricity Demand | $223,001 | 17,883 |
kW-mo/yr
|
$12.47 |
| Electricity Fees | $131,266 | - |
|
- |
| Natural Gas | $49,785 | 23,566 |
MMBtu
|
$2.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $126,486 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,148 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $79,727 | $15,485 |
$779
31,147
kWh
|
- | - |
$198
-
MMBtu
|
$78,750 | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $10,435 | $8,500 | - |
$10,435
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.3212: Optimize plant power factor | $19,611 | $12,000 | n/a | - | - | $19,611 | - | - |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $7,626 | $3,500 |
$6,041
241,630
kWh
|
$1,585
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $1,966 | $3,467 |
$1,966
78,663
kWh
|
- | - | - | - | |
| 06 | 2.6232: Install set-back timers | $1,069 | $463 | - | - | - |
$1,069
-
MMBtu
|
- | |
| 07 | 2.6218: Turn off equipment when not in use | $6,052 | $1,468 |
$6,052
242,100
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $126,486 | $44,883 |
$14,838
593,540
kWh
|
$12,020
-
kW-mo/yr
|
$19,611 |
$1,267
-
MMBtu
|
$78,750 | ||
| TOTAL IMPLEMENTED | $27,148 | $17,398 |
$14,059
562,393
kWh
|
$12,020
-
kW-mo/yr
|
- |
$1,069
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs