ITAC Assessment: OK0669
ITAC logo
ITAC Assessment: OK0669
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Hydraulic motors
NAICS 333996: Fluid Power Pump and Motor Manufacturing
SIC 3594: Fluid Power Pumps and Motors
Sales Range $1
M
to 5
M
# of Employees 350
Plant Area 223,600
ft2
Annual Production 338,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $501,929 20,097,600
kWh
Electricity Demand $223,001 17,883
kW-mo/yr
Electricity Fees $131,266 -
Natural Gas $49,785 23,566
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,486 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $79,727 $15,485 $779
31,147
kWh
- - $198
-
MMBtu
$78,750
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,435 $8,500 - $10,435
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $19,611 $12,000 n/a - - $19,611 - -
04 2.4221: Install compressor air intakes in coolest locations $7,626 $3,500 $6,041
241,630
kWh
$1,585
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $1,966 $3,467 $1,966
78,663
kWh
- - - -
06 2.6232: Install set-back timers $1,069 $463 - - - $1,069
-
MMBtu
-
07 2.6218: Turn off equipment when not in use $6,052 $1,468 $6,052
242,100
kWh
- - - -
TOTAL RECOMMENDED $126,486 $44,883 $14,838
593,540
kWh
$12,020
-
kW-mo/yr
$19,611 $1,267
-
MMBtu
$78,750
TOTAL IMPLEMENTED $27,148 $17,398 $14,059
562,393
kWh
$12,020
-
kW-mo/yr
- $1,069
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs