ITAC Assessment: MUCM02
ITAC logo
ITAC Assessment: MUCM02
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Animal Themed Hospitality
NAICS 712130: Zoos and Botanical Gardens
SIC 8422: Arboreta and Botanical or Zoological Gardens
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 26,179
ft2
Annual Production 166,000
units
Production Hrs. Annual 2,352
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,493 316,365
kWh
Electricity Demand $8,419 411
kW-mo/yr
Electricity Fees $3,562 -
Natural Gas $9,317 1,645
MMBtu
TOTAL YEARLY COSTS $67,790
RECOMMENDED SAVINGS* $10,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $465 $240 $465
3,135
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,230 $1,776 $6,230
33,692
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $147 - $147
981
kWh
-
04 2.2511: Insulate bare equipment $1,179 $580 $1,179
7,925
kWh
-
05 3.7311: Maintain machines to reduce leaks $73 $20 $62
441
kWh
$11
-
MMBtu
06 2.7261: Install timers and/or thermostats $1,592 $950 $1,351
9,652
kWh
$241
-
MMBtu
07 2.7311: Ventilation system to shut off when room is not in use $663 - $67
447
kWh
$596
-
MMBtu
08 2.7444: Close holes and openings in building such as broken windows $406 $140 - $406
-
MMBtu
TOTAL RECOMMENDED $10,754 $3,706 $9,500
56,274
kWh
$1,254
-
MMBtu
TOTAL IMPLEMENTED $9,685 $3,566 $9,433
55,826
kWh
$252
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs