ITAC Assessment: TT0095
ITAC logo
ITAC Assessment: TT0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Aluminum Extrusions
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $100
M
to 500
M
# of Employees 364
Plant Area 475,000
ft2
Annual Production 59,000,000
lb
Production Hrs. Annual 6,732
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,338,365 34,012,189
kWh
Electricity Demand $1,017,169 75,919
kW-mo/yr
Natural Gas $2,179,015 472,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $245,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,874

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1224: Replace boiler $8,685 $5,000 - - $8,685
-
MMBtu
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $165,758 $300,000 - - $165,758
-
MMBtu
03 2.2444: Use hot process fluids to preheat incoming process fluids $9,681 $50,000 - - $9,681
-
MMBtu
04 2.2511: Insulate bare equipment $1,770 $1,195 - - $1,770
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,668 $7,000 $3,098
81,518
kWh
$3,570
-
kW-mo/yr
-
06 2.6211: Conserve energy by efficient use of vending machines $190 $10 $128
3,372
kWh
$62
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $39,751 $33,080 $25,546
672,257
kWh
$14,205
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $538 $625 $255
6,698
kWh
$283
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $12,067 $8,672 $7,959
209,446
kWh
$4,108
-
kW-mo/yr
-
TOTAL RECOMMENDED $245,108 $405,582 $36,986
973,291
kWh
$22,228
-
kW-mo/yr
$185,894
-
MMBtu
TOTAL IMPLEMENTED $56,874 $46,275 $28,644
753,775
kWh
$17,775
-
kW-mo/yr
$10,455
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs