ITAC Assessment: OD0008
ITAC logo
ITAC Assessment: OD0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product vacuum pumps & accessories
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 120,000
ft2
Annual Production 5,262
pieces
Production Hrs. Annual 5,100
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,436 1,599,941
kWh
Natural Gas $6,204 793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,410 $800 $1,410
17,878
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,213 $2,774 $1,213
15,240
kWh
-
03 3.4114: Replace city water with recycled water via cooling tower $2,718 $3,000 - $2,718
-
Tgal
04 2.4133: Use most efficient type of electric motors $4,223 $4,432 $4,223
53,341
kWh
-
TOTAL RECOMMENDED $9,564 $11,006 $6,846
86,459
kWh
$2,718
-
Tgal
TOTAL IMPLEMENTED $8,351 $8,232 $5,633
71,219
kWh
$2,718
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs