ITAC Assessment: WM0119
ITAC logo
ITAC Assessment: WM0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product sewage
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 22
Plant Area 1,265,000
ft2
Annual Production 7,665,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,821 6,271,183
kWh
Electricity Demand $202,661 14,991
kW-mo/yr
Electricity Fees $39,261 -
Natural Gas $95,187 19,079
MMBtu
TOTAL YEARLY COSTS $636,930
RECOMMENDED SAVINGS* $94,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $61,350 $196,482 $61,350
1,283,173
kWh
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $14,182 $22,000 - - $14,182
-
MMBtu
-
03 2.7221: Lower temperature during the winter season and vice-versa $6,742 - - - $6,742
-
MMBtu
-
04 2.7224: Reduce space conditioning during non-working hours $4,335 - - - $4,335
-
MMBtu
-
05 2.7231: Use radiant heater for spot heating $3,420 $4,800 - - $3,420
-
MMBtu
-
06 2.7135: Install occupancy sensors $1,531 $4,972 $1,531
32,016
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,042 $2,808 $977
20,441
kWh
$65
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $867 $1,960 $867
17,170
kWh
- - -
09 2.4314: Use synthetic lubricant $865 $625 $623
13,038
kWh
$242
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $455 $830 $220
4,599
kWh
$85
-
kW-mo/yr
- $150
11 2.1131: Repair faulty insulation in furnaces, boilers, etc $197 $327 - - $197
-
MMBtu
-
TOTAL RECOMMENDED $94,986 $234,804 $65,568
1,370,437
kWh
$392
-
kW-mo/yr
$28,876
-
MMBtu
$150
TOTAL IMPLEMENTED $14,972 $10,570 $3,595
74,226
kWh
$150
-
kW-mo/yr
$11,077
-
MMBtu
$150
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs