ITAC Assessment: CO0098
ITAC logo
ITAC Assessment: CO0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AERONAUTIC MAPS,MANUALS
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 11,000,000
pieces
Production Hrs. Annual 4,484
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,041 3,962,778
kWh
Natural Gas $25,576 6,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,591

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,017 $400 - $1,017
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $1,484 $470 - $1,484
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $1,433 $1,800 $1,433
27,257
kWh
-
04 2.4312: Improve lubrication practices $275 - $275
5,275
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $275 $900 $275
5,275
kWh
-
06 2.2437: Recover waste heat from equipment $664 $1,200 - $664
-
MMBtu
07 2.4133: Use most efficient type of electric motors $97 $341 $97
1,758
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,346 $5,000 $4,346
82,943
kWh
-
TOTAL RECOMMENDED $9,591 $10,111 $6,426
122,508
kWh
$3,165
-
MMBtu
TOTAL IMPLEMENTED $6,591 $7,011 $4,443
84,701
kWh
$2,148
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs