ITAC Assessment: MO0108
ITAC logo
ITAC Assessment: MO0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Metal Storage Buildings
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 240,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,937 2,011,723
kWh
Natural Gas $58,935 16,303
MMBtu
LPG $18,000 3,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $6,226 $15,163 $6,226
92,028
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $937 $455 $937
13,775
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,702 $1,218 $4,702
69,461
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,409 $25,874 $5,409
80,012
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $230 $340 $230
3,517
kWh
06 2.4221: Install compressor air intakes in coolest locations $620 $968 $620
9,086
kWh
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,119 $1,182 $4,119
39,859
kWh
TOTAL RECOMMENDED $22,243 $45,200 $22,243
307,738
kWh
TOTAL IMPLEMENTED $7,783 $16,586 $7,783
114,889
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs