Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Apples
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 217
Plant Area 438,000
ft2
Annual Production 69,000
ton
Production Hrs. Annual 4,500
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $597,491 10,690,540
kWh
Electricity Demand $242,112 24,539
kW-mo/yr
Electricity Fees $1,152 -
Natural Gas $37,898 5,197
MMBtu
Waste Disposal Costs
Water Usage $19,000 14,992
Tgal
TOTAL YEARLY COSTS $897,653
RECOMMENDED SAVINGS* $16,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,275 $20 $1,548
27,635
kWh
$727
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $616 $960 - - $616
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $257 $30 $83
1,477
kWh
$175
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,313 $760 $1,313
23,537
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $821 $275 $552
9,900
kWh
$268
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $545 $210 $371
6,620
kWh
$174
-
kW-mo/yr
-
07 2.2531: Re-size charging openings or add movable cover or door $10,186 $790 $10,186
181,892
kWh
- -
TOTAL RECOMMENDED $16,013 $3,045 $14,052
251,060
kWh
$1,345
-
kW-mo/yr
$616
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs