Assessment Year | 2019 |
---|---|
Principal Product | Apples |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $10 M to 50M |
# of Employees | 217 |
Plant Area |
438,000
ft2
|
Annual Production | 69,000
ton
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $597,491 | 10,690,540 |
kWh
|
$0.056 | |
Electricity Demand | $242,112 | 24,539 |
kW-mo/yr
|
$9.87 | |
Electricity Fees | $1,152 | - |
|
- | |
Natural Gas | $37,898 | 5,197 |
MMBtu
|
$7.29 | |
Waste Disposal Costs | |||||
Water Usage | $19,000 | 14,992 |
Tgal
|
$1.27 | |
TOTAL YEARLY COSTS | $897,653 | ||||
RECOMMENDED SAVINGS* | $16,013 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,275 | $20 |
$1,548
27,635
kWh
|
$727
-
kW-mo/yr
|
- | |
02 | 2.2511: Insulate bare equipment | $616 | $960 | - | - |
$616
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $257 | $30 |
$83
1,477
kWh
|
$175
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $1,313 | $760 |
$1,313
23,537
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $821 | $275 |
$552
9,900
kWh
|
$268
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $545 | $210 |
$371
6,620
kWh
|
$174
-
kW-mo/yr
|
- | |
07 | 2.2531: Re-size charging openings or add movable cover or door | $10,186 | $790 |
$10,186
181,892
kWh
|
- | - | |
TOTAL RECOMMENDED | $16,013 | $3,045 |
$14,052
251,060
kWh
|
$1,345
-
kW-mo/yr
|
$616
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs