Assessment Year | 2003 |
---|---|
Principal Product | Marine, Industrial Hardware |
NAICS | 332111: Iron and Steel Forging |
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 118 |
Plant Area |
160,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $301,347 | 7,770,110 |
kWh
|
$0.039 |
Electricity Demand | $214,459 | 49,718 |
kW-mo/yr
|
$4.31 |
Electricity Fees | $38,526 | - |
|
- |
Natural Gas | $443,968 | 74,504 |
MMBtu
|
$5.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $269,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $251,081 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.431: Train operators for maximum operating efficiency | $99,450 | $110,400 | - | - | - | - | - | $99,450 | |
02 | 3.5145: Recover and reuse spent acid baths | $30,138 | $3,234 | - | - | - | - |
$9,945
-
gal
|
$20,193 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,370 | $17,064 |
$14,694
206,960
kWh
|
$2,676
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,503 | $937 |
$10,503
147,931
kWh
|
- | - | - | - | - | |
05 | 2.3212: Optimize plant power factor | $9,177 | $20,736 | - | - | $9,177 | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $8,763 | $5,538 | - | - | - |
$8,763
-
MMBtu
|
- | - | |
07 | 2.4224: Upgrade controls on compressors | $93,620 | $94,691 |
$90,897
1,280,244
kWh
|
$2,723
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $269,021 | $252,600 |
$116,094
1,635,135
kWh
|
$5,399
-
kW-mo/yr
|
$9,177 |
$8,763
-
MMBtu
|
$9,945
-
gal
|
$119,643 | ||
TOTAL IMPLEMENTED | $251,081 | $226,326 |
$116,094
1,635,135
kWh
|
$5,399
-
kW-mo/yr
|
- | - |
$9,945
-
gal
|
$119,643 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs