ITAC Assessment: BD0241
ITAC logo
ITAC Assessment: BD0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Sheet and Rollstock Plastic
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 170,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,447 9,425,600
kWh
Electricity Demand $33,448 18,246
kW-mo/yr
Natural Gas $39,852 4,219
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $10,583 $6,000 - - - $10,583
-
MMBtu
- - - -
02 2.7231: Use radiant heater for spot heating $9,264 $8,000 - - - $9,264
-
MMBtu
- - - -
03 2.4133: Use most efficient type of electric motors $5,881 $21,875 n/a $5,457
150,766
kWh
$424
-
kW-mo/yr
- - - - - -
04 2.2511: Insulate bare equipment $4,752 $3,450 $4,752
101,231
kWh
- - - - - - -
05 2.7135: Install occupancy sensors $2,861 $1,380 $2,591
71,572
kWh
$270
-
kW-mo/yr
- - - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,521 $700 $1,387
38,295
kWh
$134
-
kW-mo/yr
- - - - - -
07 2.7111: Reduce illumination to minimum necessary levels $658 $255 $529
14,619
kWh
$52
-
kW-mo/yr
- - - $15 - $62
08 2.4221: Install compressor air intakes in coolest locations $553 $1,000 $504
13,915
kWh
$49
-
kW-mo/yr
- - - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $453 $465 $205
5,659
kWh
$14
-
kW-mo/yr
- - - $98 - $136
10 2.7142: Utilize higher efficiency lamps and/or ballasts $295 $105 $141
3,894
kWh
$14
-
kW-mo/yr
- - - $50 - $90
11 2.4231: Reduce the pressure of compressed air to the minimum required $221 - $201
5,557
kWh
$20
-
kW-mo/yr
- - - - - -
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $154 $80 $144
3,984
kWh
$10
-
kW-mo/yr
- - - - - -
13 3.5217: Reuse / recycle/ sell paper products $9,892 $2,000 - - $1,000 - $8,892
-
lb
- - -
14 3.5315: Lease / purchase baler; sell cardboard to recycler $2,002 $1,000 - - - - $2,002
-
lb
- - -
15 3.5316: Contract a wood pallet recycling company $1,080 $323 - - - - $1,080
-
lb
- - -
16 4.231: Purchase equipment instead of leasing $9,320 $20,000 - - - - - - $9,320 -
TOTAL RECOMMENDED $59,490 $66,633 $15,911
409,492
kWh
$987
-
kW-mo/yr
$1,000 $19,847
-
MMBtu
$11,974
-
lb
$163 $9,320 $288
TOTAL IMPLEMENTED $16,460 $6,255 $6,280
143,420
kWh
$148
-
kW-mo/yr
$1,000 - $8,892
-
lb
$50 - $90
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs